Pile / Plate Load Test / Footing Load Test

pile foundation construction Pile Load Test Rotary Pile

The load test shall be conducted by applying a vertical load on the Pile / test footing / M.S. Plate. The test shall be carried out in relevance with IS 1888 – 1982. It is proposed to transfer the load by reaction anchors attached to a designed truss frame / loading platform. Corresponding Settlements are recorded.